Search This Blog

Tuesday, October 15, 2013

Equipment changes caused power outage

A massive power outage inside and outside the east Village gate along Highway 5 was caused earlier today when First Electric Cooperative changed out switches. The equipment exchange caused five different outages impacting service to 932 households. The power was restored before 2 p.m. but was expected to be out until 4 p.m.

No comments:

Post a Comment